<?xml version="1.0"  encoding="iso-8859-1"?>
<?xml-stylesheet type="text/css"  href="http://www.norfolk.gov/norfolk/styles/rss1.xsl" ?>
 <rss version="2.0">
 <channel>
  <title>City of Norfolk Va Tide Construction</title>
  <link>http://www.norfolk.gov/</link>
  <description>Latest Tide Construction Information.</description>
  <language>en-us</language>
  <webMaster>webmaster@norfolk.gov</webMaster>
  <item>
  <title>Light rail construction at intersection of Boush and Bute, two-way traffic maintained</title>
  <description>Light rail track installation will close lanes at Boush/Bute Street intersection starting Monday, November 23, light rail construction will cross the intersection of Boush Street and Bute Street. 
The work will be completed in 2 phases and is expected to last through early February. Though traffic patterns will change with both phases of the work, two-way traffic and pedestrian access will be maintained at all times. 
</description>
  </item>
 </channel>
 </rss>
